A. General. Upon completion of all subdivision improvements and installation of monumentation the city engineer will perform a final inspection and review the final reports and as-built drawings for approval.

B. Final Inspection. At completion of the project a final inspection shall be requested with the city engineer. See procedures in the Design Standards Manual.

C. Final Report. A final report shall be submitted upon completion of the project. The final report shall be compiled by the applicant’s engineer and shall meet the guidelines in the Design Standards Manual.

D. Warranty Period on Public Improvements. The warranty period begins on the day that the city council accepts the public improvements. At a minimum a warranty period of one year for all utilities, roadway pavement and structure, landscaping and other public improvements shall apply to all subdivision improvements; however, the warranty period may extend beyond that time period as determined by the city engineer. During the warranty period the applicant is responsible for repair work to any of the public improvements. The city engineer will periodically inspect the public improvements and will notify the applicant of the necessary repair work. The applicant is responsible for having the repair work completed prior to the end of the warranty period. Upon completion of the warranty period and acceptable repair of any necessary warranty items the remainder of the financial assurances retained by the city will be released. [Ord. 20-11 §2(14-7-6); Res. 20-31.]